在线观看国产精品电影-国产色综合久久无码有码-18禁超污无遮挡无码免费网站国产-国产日韩欧美

Welcome to zhongying water supply Hunan, China Website
Your Position: Home > Experts > Service Center

How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
主站蜘蛛池模板: 亚洲精品乱码久久久久久| 精品人妻系列无码一区二区三区| 亚洲a∨精品一区二区三区下载| 国产在线精品一区二区不卡| 欧美一区二区三区红桃小说| 亚洲精品无码专区| 蜜臀av在线播放一区二区三区| 99久久99这里只有免费费精品| 20女人牲交片20分钟| 人妻夜夜爽天天爽三区| 亚洲综合色婷婷在线观看| 18禁无遮挡羞羞污污污污免费| 亚洲午夜精品久久久久久app| 日日av色欲香天天综合网| 亚洲精品国产电影| 人妻巨大乳hd免费看| 欧美a级毛欧美1级a大片免费播放 久久久久亚洲av成人无码电影 | 成人国产一区二区三区| 亚洲av无码乱码在线观看野外| 久久久国产成人一区二区| 亚洲综合另类小说色区| 久久99国产综合精品| 久久人人爽人人爽人人av| 亚洲 欧美 另类 在线| 97影院在线午夜| 亚洲人成色99999在线观看| 亚洲精品无码精品mv在线观看| 男女真人后进式猛烈动态图| 人妻无码第一区二区三区| 强制入侵完整版在线观看| 亚洲欧美人成网站在线观看看| 人妻在卧室被老板疯狂进入 | 成人无码精品一区二区三区 | 熟妇高潮喷沈阳45熟妇高潮喷| 日本一二三区视频在线| 久久久精品国产一二三产区区别| 永久免费观看的毛片手机视频| 国产一区二区三区在线2021| а√最新版在线天堂| 国产精品久久久久9999小说| 久久人人爽人人人人片av|